Local proof
4.8
Google rating across 48 homeowner reviews.
Firm quotes, prep-first execution, and daily communication from first walkthrough to final handoff.

If you need cabinet painting in Burnaby, choose a prep-first team. We define scope by substrate, map product systems before production, and run a controlled schedule from setup to final walkthrough.
Burnaby • Cabinet Painting
Cabinet painting requires degreasing, abrasion, and controlled spray finishing to avoid premature failure.
Burnaby Heights homes built in the 1980s still carry their original oak cabinets with dark stain and raised panels. Your condo kitchen near Metrotown likely has limited ventilation for spray equipment. The right spray system depends on the space -- AAA, airless, and low-overspray setups each suit different site conditions. Multi-unit buildings where air handling is restricted need careful equipment selection before any spray work begins.
Homeowners comparing cabinet painting options should prioritize prep detail and spray-process control over quick cosmetic paintovers.
Burnaby cabinet painting typically costs $4,500 to $10,000 depending on condo ventilation requirements, oak prep, and total door count across kitchen and bathroom.
Local proof
4.8
Google rating across 48 homeowner reviews.
Firm quotes, prep-first execution, and daily communication from first walkthrough to final handoff.
Where we work
Brentwood • Burnaby Heights • Metrotown • Edmonds
Every area has different light, moisture, and wear. That local context changes how we plan cabinet painting from the start.
View the Burnaby hub
Burnaby Cabinet Painting
Kitchen and bathroom cabinets refinished with a controlled spray process for smooth, durable surfaces that outperform rushed brush-and-roll work. Every stage is written down before work begins. That keeps the finish clean, the timing clear, and the handoff much less stressful for the homeowner.
Prep
01
Remove and label doors and drawers, then degrease, abrade, and repair every cabinet component.
Coat plan
02
Apply adhesion-promoting primer and spray-grade coatings in controlled conditions for a smooth factory-style finish.
Final review
03
Reinstall hardware with alignment checks and complete a final cure and care walkthrough.
Materials and finish control
Product selection follows substrate condition, wear pattern, and maintenance goals. That is how we keep adhesion, colour depth, and maintainability aligned with the way a space is used.
Typical project range: $6,500–$18,400
Local planning note
A single Burnaby block can hold a 1960s rancher, a 2020 laneway home, and a mid-rise tower. Your home needs a painting process built for its actual substrate -- not a one-size approach borrowed from the last job.
That local context changes how we schedule work, how we prepare surfaces, and what we flag during the walkthrough before your quote is finalized.
Most painting scopes overlap. These linked guides help you compare the full plan, from your local service page to related finishes and the broader city hub.
Burnaby Homeowners
“The kitchen looks like a brand new kitchen was installed. I still cannot believe they are my old cupboards. The quality is unbelievable. His eye for detail is incredible - top quality workmanship.”
— Marinda
FAQs
These are the questions we usually answer before a project is booked, priced, and placed on the calendar.
Final pricing depends on prep level, surface condition, and project size. We provide a fixed quote after the walkthrough so scope and timeline are clear before scheduling.
Most scopes run between 2 and 10 days depending on substrate repairs and weather constraints. Each estimate includes a staged plan with milestone dates.
Yes. We align primer, topcoat, and sheen to substrate condition, usage pattern, and long-term maintenance goals before production starts.
We use written prep standards, daily communication, and final punch-list walkthroughs. That structure keeps line quality, finish consistency, and site cleanliness predictable.
Book a walkthrough and get a firm quote, start dates, and written prep standards before anything is scheduled.
Book any season. Condo projects need strata approval for spray equipment, so allow two extra weeks for building coordination before your start date.